7P.Y.L. Tu,R. Yam,P. Tse,A.O. Sun.An Integrated Maintenance Management System for an Advanced Manufacturing Company[J]. International Journal of Advanced Manufacturing Technology . 2001 (9)
8ZHOU X J,XI L F,LEE J.Reliability centered predictive maintenance scheduling for a continuously monitored system subject to degradation. Reliability Engineering and System Safety . 2007
9Linton D. G,Khajenoori S.Smart Scheduling for Better Repair Depot Reliability. IEEE Transactions on Reliability . 1997