摘要
结合成都市犀浦镇龙梓万片区电力隧道工程实例,针对顶管隧道施工力学进行了研究,分析了工程设计要点和施工技术控制要领,并对既有地铁盾构区间进行了受力模拟计算和安全性分析,为类似工程积累了一定经验。
Abstract: Combining with the electric power tunnel engineering examples of Longziwan district Xipu Chengdu, researched the pipe jacking tunnel construction mechanics, analyzed the key points of engineering design and construction technology control key methods, and made the force simu- lation calculation and safety analysis on existing metro interval, accumulated certain experience for similar engineering.
出处
《山西建筑》
2014年第7期188-189,共2页
Shanxi Architecture
关键词
电力隧道
穿越
既有地铁区间
模拟计算
Key words: power tunnel, crossing, existing metro interval, simulation calculation