期刊文献+

基于实时监控的碾压混凝土VC值变化量预测模型研究 被引量:6

Study on prediction model of variations in VC value of RCC based on real-time monitoring
原文传递
导出
摘要 碾压混凝土坝施工气候是造成碾压混凝土VC值(vibrating-compacted value,单位:s)变化的主要因素之一,建立考虑施工气候参数影响的碾压混凝土VC值变化量的预测模型,对于保证碾压混凝土坝施工质量,具有重要的理论意义。本文依托碾压混凝土坝施工气候信息实时监控技术,提取碾压混凝土坝施工气候参数值(温度、相对湿度以及风速),通过现场检测获得了对应的VC值变化量,采用多元回归分析方法,分析施工气候参数与VC值变化量之间的多元映射关系,建立VC值变化量的预测模型。该模型可以对施工现场碾压混凝土VC值的变化量进行实时预测,反馈指导施工管理人员采取相应措施修改VC值,为碾压混凝土坝质量控制提供新的途径。 Climatic information on construction site is a major factor affecting the vibrating-compacted (VC) value of roller compacted concrete (RCC) dam. To control this value in dam construction, it is theoretically significant to develop a model for real-time prediction of its variations through examination of the influences of various climate parameters. In this study, real-time monitoring and field measurements of the construction climate are conducted, its parameter values, i.e. temperature, relative humidity and wind velocity, are collected, and hence the variations in VC value are obtained. Multiple regression analysis on these data reveals multivariate mapping relations between the parameters and the variations, and based on the analysis, a model for prediction of the variations is developed. This model is able to produce a real-time prediction and support the construction managers in taking feedback control and compensation measures of the VC value, and thus it provides a new way to quality control of RCC dam construction.
出处 《水力发电学报》 EI CSCD 北大核心 2014年第1期154-160,共7页 Journal of Hydroelectric Engineering
基金 国家自然科学基金创新研究群体科学基金(51021004) 国家自然科学基金(51339003) 国家重点基础研究发展973计划(2013CB035904)
关键词 水利工程施工 VC值变化量 实时监控 碾压混凝土 施工气候 预测模型 hydraulic engineering construction variation in VC value real-time monitoring RCC construction climate prediction model
  • 相关文献

参考文献10

  • 1Bennett B C,Rugh M P,Stiady J L. Controlling RCC mix workability for Olivenhain dam construction[A].{H}Madrid,Spain,2003.923-932.
  • 2Stiady J L,Bennett B C. Developing database and reporting system softwares for quality control testing[A].{H}Madrid,Spain,2003.1057-1066.
  • 3Marulanda A,Castro A,Sanchez F A. Ensuring quality control when building RCC dams[A].{H}Madrid,Spain,2003.995-1003.
  • 4Chevva Krishnaiah,Shirke J M,Ghosh N. Assessment of concrete quality using non-destructive techniques.Ghatghar project,Maharashtra,India[J].{H}BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT,2008,(1):65-70.
  • 5Dolen T P,Richardson A T,White W R. Quality Control / Inspection — Upper Stillwater Dam[A].{H}New York,USA,1988.277-293.
  • 6梁润;冯立生.碾压混凝土的振动压实参数[J]{H}水力发电学报,1987(4):56-70.
  • 7Matsushima M,Yasuda N. Advanced control for VC-value of roller-compacted dam concrete using artificial neural networks[A].Edinburgh,UK,1998.207-214.
  • 8Choi Y K,Neighbors J D,Reichler J D. Cold weather placement of RCC[J].{H}JOURNAL OF MATERIALS IN CIVIL ENGINEERING,2003,(2):118-124.
  • 9宗建伦.天花板水电站高温季节大坝碾压混凝土施工质量控制[J].水力发电,2011,37(6):71-73. 被引量:6
  • 10克劳斯-巴克豪斯;本德-埃里克森;王煦逸.多元统计分析方法--用SPSS工具[M]{H}上海:上海人民出版社,2009.