摘要
根据作者的实践经验,从新转轮选用、现场测量、结构设计、加工等环节,探讨了老电站水轮发电机组更新改造中应当注意的一些关键问题以及解决方法。
According to author's experiences,some key points that should be take care and solutions during turbine generator technical reform in old hydropower stations were discussed,such as selection of new runner,on site measurement,structure design and manufacture.
出处
《水电站机电技术》
2013年第6期1-4,67,共4页
Mechanical & Electrical Technique of Hydropower Station
关键词
水电站
主机
改造
关键点
探讨
hydropower station
turbine generator
reform
key points
discussion