期刊文献+

Production Planning and Control of the Pipeline Assembly Enterprise under SCM

Production Planning and Control of the Pipeline Assembly Enterprise under SCM
在线阅读 下载PDF
导出
摘要 It is vital for pipeline assembly enterprise to respond to changing market needs quickly and keep its cost advantage. A production planning and control (PPC) model under supply chain management combining with operation characteristics of pipeline assembly enterprise was proposed. The present model can realize synchroni- zation in real-time response in production by establishing a win-win corporate model, classified regulation be- tween strategic parts and non-strategic parts, postponing the production of special modules and guaranteeing pro- duction at the bottleneck. It is vital for pipeline assembly enterprise to respond to changing market needs quickly and keep its cost advantage. A production planning and control (PPC) model under supply chain management combining with operation characteristics of pipeline assembly enterprise was proposed. The present model can realize synchroni- zation in real-time response in production by establishing a win-win corporate model, classified regulation be- tween strategic parts and non-strategic parts, postponing the production of special modules and guaranteeing pro- duction at the bottleneck.
机构地区 School of Management
出处 《International Journal of Plant Engineering and Management》 2013年第3期159-164,共6页 国际设备工程与管理(英文版)
关键词 SCM production .plan and control POSTPONEMENT BOTTLENECK SCM production .plan and control postponement bottleneck
  • 相关文献

参考文献1

二级参考文献6

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部