大直径(超)长灌注桩竖向载荷试验研究 被引量:11

Study on large diameter and(super) long bored piles by using vertical loading tests
原文传递
导出
摘要 本文通过厦门某项目大直径(超)长灌注桩桩端有无注浆、不同持力层的对比静载试验以及基坑底大吨位(6000kN)抗拔试验,分析研究大直径(超)长灌注桩的竖向承载性能,得出以下结论和建议:抗压桩、抗拔桩均存在侧阻力时间效应因素的影响而降低桩侧摩阻力,当暴孔约9d,抗压桩桩侧摩阻力降低约23%,抗拔桩桩侧摩阻力降低约1/3;采用S-lgP法和经验参数法(结合静载试验)分离桩侧摩阻力和桩端阻力,表明大直径超长灌注桩即使是嵌岩桩通常也属于端承摩擦桩,侧摩阻力先于端阻力发挥,故应先满足桩身压屈变形,才能保证桩端阻力的发挥;不管是抗压桩还是抗拔桩,可优先考虑桩侧注浆,可较大幅度提高桩侧摩阻力,而不要盲目增加桩长或嵌岩深度;桩侧抗拔土阻力峰值对应的桩顶上拔量同样约为0.02D,当桩周土层为全风化岩—强风化岩时,抗拔系数约为0.60。 Based on the static loading tests with the post grouting or not for the cast-in-situ piles for a project in Xiamen with large diameter and(super) long bored piles,the contrast static loading tests on pile tip in different soils,and the uplift static loading tests in foundation pit with big load 6000kN,the vertical bearing performance of the large diameter and(super) long bored piles is analyzed on the basis of many groups of contrast vertical loading tests.The conclusions and suggestions are as follows: the pile side friction resistance of compressive pile or uplift pile is reduced because of the time effect;when the finished bore hole is in air for 9 days,the side friction resistance of compressive pile is reduced about 23%,and the uplift pile is reduced about 1/3;with the S-lgP method or the empirical coefficient method(combined with loading tests),the pile side friction and the pile tip resistance are separated,which shows that large diameter and super long bored piles usually belong to the end bearing friction pile,and the pile side friction resistance is brought into play before the pile tip resistance,so it should be met the pile shaft buckling deformation firstly to ensure the display of the pile tip resistance;for compressive pile and uplift pile,the pile side friction resistance is greatly improved by pile grouting rather than blindly increasing pile length;the peak value of the side uplift soil resistance of the large diameter bored pile corresponding to the uplift value of the top pile is also about 0.02D and when the soil around the pile is the weathered rock and the strongly weathered rock,the uplift factor is about 0.60.
出处 《工程勘察》 2013年第9期7-13,18,共8页 Geotechnical Investigation & Surveying
关键词 Q-S曲线 U-δ曲线 侧阻力时间效应系数ψt S-lgP法 经验系数法 抗拔系数 Q-s curve U-δ curve time effect coefficient of side resistance S-lgP method empirical coefficient method uplift factor
  • 相关文献

参考文献4

二级参考文献23

  • 1史佩栋,梁晋渝.嵌岩桩竖向承载力的研究[J].岩土工程学报,1994,16(4):32-39. 被引量:124
  • 2董金荣,林胜天,戴一鸣.大口径钻孔灌注桩荷载传递性状[J].岩土工程学报,1994,16(6):123-131. 被引量:56
  • 3侯龙清,徐红梅,罗嗣海.红层嵌岩桩承载性状试验研究[J].工程勘察,2005,33(6):13-15. 被引量:8
  • 4谢宁,孙钧.上海地区饱和软粘土流变特性[J].同济大学学报(自然科学版),1996,24(3):233-237. 被引量:50
  • 5中华人民共和国国家标准.建筑地基基础设计规范(GB50007-2002)[S].北京:中国建筑工业出版社,2002.
  • 6施峰.大直径超长钻孔灌注桩的承载性状研究[A].福建建筑技术研究--福建省建筑科学研究院45周年院庆论文集[C].北京:中国建筑工业出版社,2003:7-12.
  • 7蔡来炳.高应变动力试桩法分析嵌岩桩的承载特性[A].福建建筑技术研究--福建省建筑科学研究院45周年院庆论文集[C].北京:中国建筑工业出版社,2003:144-147.
  • 8施峰,柳春.福州软土地区大直径超长灌注桩的实践[A].结构与地基国际学术研讨会论文集[C].浙江大学出版社,1994:226-229.
  • 9中华人民共和国行业标准.建筑桩基技术规范(JGJ94-2008)[S].北京:中国建筑工业出版社,2008.
  • 10中华人民共和国国家标准.混凝土结构设计规范(CB50010-2002)[S].北京:中国建筑工业出版社,2002.

共引文献35

同被引文献99

引证文献11

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部