4Liao C J,Shyu C H. An analytical determination of lead time with normal demand [ J ]. Int. J. Opns Prod. Mgmt, 1991 ( 11 ) :72-78.
5罗杰·G施罗德.运作管理[M].4版.北京:北京大学出版社,2000:614-617.
6Razmi J., et al.. Use of analytic hierarchy process approach in classification of push, pull and hybrid push-pull systems for production planning[J]. International Journal of Operation & Production Management, 1998,18:1134-1151.
7Bracht U.. Logistic-Oriented Approach to Factory Planning and Production System, October 5-7, 2000[C]//Presented at the Total Logistics Management, Ustron, Poland, 2000.
8Harris R.. Marking materials flow: a lean material-handling guide for operations, production-control, and engineering professionals[M]. Cambrudge, Mass: Lean Enterprise Institute, 2003.
9Hines P., et al.. Learning to evolve: A review of contemporary lean thinking[J]. International Journal of Operations & Porduction Management, 2004,24:994-1011.