期刊文献+

大型热交换器装芯抽芯机设计 被引量:1

Design and Development of Core Installer and Puller for Large Heat Exchanger
在线阅读 下载PDF
导出
摘要 大型热交换器装芯抽芯机是影响热交换器的装配及检修效率的重要设备,国内目前使用的热交换器装配检修设备较为落后。大型热交换器装芯抽芯机的步进移动装置是重要组成部分,也是热交换器装芯抽芯机设计和制造的关键。针对国内外热交换器装芯抽芯机存在的技术缺陷和不足,制订了新的热交换器装芯抽芯机设计方案。通过调研和类比设计法确定了其主体结构。该装置结构新颖、性能稳定可靠、安全性高、作业效率高,改变了长期依赖吊车配合装芯抽芯作业的局面。 The core installer and puller can affect the maintenance efficiency and duration. The domestic overhaul equipment gets relatively behind. The stepping movement device is the most important part in it, and the key part in design and manufacturing as well. In view of technical shortcomings and insufficiency, both foreign and domestic installer and puller have been designed the investigation and analogical design method were used for its main structure and checked with Solidworks. The new equipment is new in structure, reliable in performance, high safety and operation efficiency, thus the crane that should be used during maintenance is changed.
出处 《石油化工设备》 CAS 2013年第3期37-40,共4页 Petro-Chemical Equipment
关键词 热交换器 抽芯 装芯 设备 设计 heat exchanger core pulling core installing equipment design
  • 相关文献

参考文献11

二级参考文献47

共引文献52

同被引文献7

  • 1JB/T4730.1-4730.6-2005承压设备无损检测.
  • 2固定式压力容器安全技术监察规程.TSGR0004-2009.
  • 3NB/T47015-2011压力容器焊接规程[S].
  • 4GB151-1999.管壳式换热器[S].[S].北京:国家质量技术监督局,1999..
  • 5NB/T47014-2011承压设备焊接工艺评定.
  • 6GB150.1-150.4-2011压力容器.
  • 7JB/T4731-2005,钢制卧式容器,全国压力容器标准化技术委员会,2011.

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部