摘要
大化水电站扩建工程围堰施工过程中,针对实际出现或变化的基本条件,采取了相应的调整处理措施,进行修改完善,达到了原设计的功能目的。文章介绍了大化水电站扩建工程围堰设计及施工过程的修改完善。
The cofferdam for the extension project of hydropower station achieves the original designed function by appropriate adjustments and improvements based on the practical situations during the construction process. The pa- per gives a detailed introduction to the design and the modifications of cofferdam during the construction process.
出处
《红水河》
2013年第2期9-12,共4页
Hongshui River
关键词
围堰设计
施工过程
处理措施
大化水电站扩建工程
cofferdam design
construction process
treatment measures
extension project of Dahua hydropower station