摘要
根据大化水电站扩建工程枢纽布置的需要,引水渠右侧、接头土石坝坡脚处设置了一段圆弧型翼墙,因基础地质较差,采取了一系列工程处理措施,经过两年多时间的运行,证明上游翼墙设计合理、工程处理合适。
Based on the layout requirement of Dahua hydropower station extension project, an arc wing wall is set at the slope toe of joint earth-rock dam on the measures are required due to poor fundamental right side of diversion channel. A series of engineering treatment geology. It is proved that the upstream wing wall is reasonable in design and suitable in engineering treatment throughout practical running more than two years.
出处
《红水河》
2012年第3期1-5,共5页
Hongshui River
关键词
翼墙
基础处理
大化水电站扩建工程
wing wall
foundation treatment
extension project of Dahua hydropower station