摘要
讨论了塑料挤出模的调试程序、方法、调试前的准备及移交生产前应作的技术工作 。
The extrusion mould debugging procedure and method were discussed. And the preparation work before debugging and the technical work necessary before putting the mould into production were stated. An example was given to explain the whole process of extrusion mould debugging.
出处
《模具工业》
2000年第9期49-52,共4页
Die & Mould Industry
关键词
塑料成型
塑料挤出模
调试
plastics moulding, extrusion mould, mould debugging