1Meisel F, Bierwirth C. Heuristics for the integation of crane productivity in the berth allocation problem[J].Transportation Research Part E:Logisties and Transporta- tion Review, 2009, 45(1):196-209.
2Zhang C, Zheng L, Zhang Z, et al. The allocation of berths and quay cranes by using a sub-gradient optimization technique[J]. Computers & Industrial Engineering, 2010, 58(1):40-50.
4Liang C, Huang Y, Yang Y. A quay crane dynamic scheduling problem hybrid evolutionary algorithm for berth allocation planning [J]. Computers & Industrial Engineering Intelligent Manufacturing and Logistics, 2009, 56(3): 1021-1028.
5Lee D H, Qiu Wang H. Integrated discrete berth allocation and quay crane scheduling in port container terminals [J]. Engineering Optimization, 2010, 42(8): 747-761.
2DAGANZO C F. The crane scheduling problem[ J ]. Transportation Research B, 1989, 23 (3) : 159-175.
3PETERKOFSKY R I, DAGANZO C F. A branch and bound solution method for the crane scheduling problem[ J]. Transportation Research B, 1990, 24(3) : 159-172.
4GAMBARDELLA L M, RIZZOLI A E, ZAFFALON M. Simulation and planning of an intermodal container terminal[ J]. Simulation, 1998, 71 (2) : 107-116.
5GAMBARDELLA L M, MASTROLILI M, RIZZOLI A E, et al. An optimization methodology for intermodal terminal management [ J ]. J Intelligent Manufacturing, 2001, 12(5/6): 521-534.
6GUAN Yongpei, XIAO Wenqiang, CHEUNG R K, et aL A multiprocessor task scheduling model for berth allocation: heuristic and worst-case analysis[J]. Operations Res Lett, 2002, 30(5): 343-350.
7BISH E K. A multiple-crane-constrained scheduling problem in a container terminal[ J ]. Eur J Operational Res, 2003, 144 ( 1 ) : 83-107.
8PARK Y M, KIM K H. A scheduling method for berth and quay cranes [ J ]. OR Spectrum, 2003, 25 ( 1 ) : 1-23.
9LEE Der-Horng, WANG Huiqiu, MIAO Lixin. Quay crane scheduling with noninterference constraints in port container terminals [ J ]. Transporta- tion Res E, 2008, 44(1) : 124-135.
10CANONACO P, LEGATO P, MAZZA R M, et al. A queuing network model for the management of berth crane operations[ J ]. Computers & Oper- ations Res, 2008, 35 (8) : 2432-2446.
1L! C L, CAI X, LEE C Y. Scheduling with Multiple-Job- On-One-Processor Pattem[ J ]. IE Transactions, 1998, 30 : 433 -445.
2GUAN Y,XIAO W Q, CHEUNG R K,et al. A Multipro- eessor Task Scheduling Model for Berth Alloeation:Heu- ristie and Worst-Ease Analysis [ J ]. Operations Research Letters, 2002,30 ( 5 ) : 343 -350.
3AK A, ERERA A L. Simultaneous Berth and Quay Crane Scheduling for Container Ports [ R ]. Georgia Institute of Technology, 2006.
4LIANG Chengji, HUANG Youfang, YANG Yang. A Quay Crane Dynamic Scheduling Problem by Hybrid Ev- olutionary Algorithm for Berth Allocation Planning [ J ]. Computers & Industrial Engineering, 2009, 56: 1021- 1028.
5BIRGER R W, DULLAERT R, SCHAEREN V. An En- riched Model for the Integrated Berth Allocation and Quay Crane Assignment Problem [ J ]. Expert Systems with Applications ,2011,38 : 14136-14147.
6YANG Chunxia, WANG Xiaojun, LI Zhenfeng. An Op- timization Approach for Coupling Problem of Berth Allo- cation and Quay Crane Assignment in Container Terminal [ J ]. Computers & Industrial Engineering, 2012, 63 : 243-253.
7YAVUZ B T, TASKIN Z C, NECATI A, et al. Optimal Berth Allocation and Time-Invariant Quay Crane Assign- ment[ J]. European Journal of Operational Research in Container Terminals, 2013, 1-14.