基于原型监测的三湾泄洪闸墩施工期开裂成因分析

Analysis of Causes of Concrete Cracks Appear in Sluice Pier of Sanwan Project Based on Prototype Monitoring
原文传递
导出
摘要 三湾水利枢纽地处中国北方严寒地区,工程2009年开工,目前尚在施工期。2011年10月发现闸墩混凝土存在裂缝,部分裂缝已贯穿整个闸墩。文章从原型监测资料着手,通过详细计算与对比分析,探讨了泄洪闸墩混凝土开裂的原因。分析认为,施工期闸墩温度大幅度升降是造成混凝土开裂的主要原因,北方严寒地区夏季浇筑混凝土应采取有效的温控措施。 Dandong Sanwan water control project located in the cold area of north China. This project started in 2009, and is presently in the period of construction. It had been found that there were cracks in concrete gate pier in Oct, 2011, some of them run through the entire gate pier. In this paper, the prototype monitoring data were calculated and compared to discuss the cause of the cracks. The analysis results show that the main reason to cause the cracks is large amplitude of concrete temperature. In the cold area of north China, the effective temperature control measure must be taken in summer during the concreting.
出处 《水电自动化与大坝监测》 2012年第6期53-56,共4页 HYDROPOWER AUTOMATION AND DAM MONITORING
关键词 原型监测 应变计 闸墩裂缝 严寒地区 温控 prototype monitoring strain gauges crack cold area temperature control
  • 相关文献

参考文献5

  • 1中国水利水电科学研究院结构材料研究所,水利部水工程建设与安全重点实验室,北京中水科海利工程技术有限公司.丹东三湾泄水闸底板及闸墩裂缝成因分析及对闸室安全的影响评价[R] ,2012.
  • 2中国水利水电科学研究院结构材料研究所,水利部水工程建设与安全重点实验室,北京中水科海利工程技术有限公司.丹东三湾泄水闸底板及闸墩温控防裂反馈分析[R],2012.
  • 3潘琳,苟晓丽,韩世栋,沈慧.关于混凝土实测应变和应力状态几个问题的探讨[J].水电自动化与大坝监测,2010,34(6):46-48. 被引量:3
  • 4苟晓丽,韩世栋,沈慧,等.康扬水电站泄洪闸墩异常应力分析[C]//2008年大坝安全监测设计与施工技术交流会论文集,2008.
  • 5刘志强.浅谈混凝土施工温度及裂缝控制[C]//2009年河南省建筑行业优秀论文集.2009.

二级参考文献1

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部