期刊文献+

白石水库碾压混凝土坝温度控制与防裂措施的研究与应用 被引量:5

Research and Application of Temperature Control and Crack-proof Measures on Baishi RCD Dam
在线阅读 下载PDF
导出
摘要 白石大坝是继观音阁大坝之后在北方严寒地区修建的又一座碾压混凝土坝(RCD),北方严酷的气候条件、间歇式的施工方法及碾压混凝上坝自身的特点,使其温控与防裂成为工程的一个重要课题.本文介绍了该坝的温度控制设计标准、防裂措施技术要求和仿真计算分析的主要结论;依据理论计算和实践经验,总结了大坝施工中为防止裂缝所采取的包括降温、保温、结构和原材料等一系列有效措施.可供北方严寒地区碾压混凝土坝进行温控、防裂提供借鉴和参考. Baishi RCD Dam is another one constructed in northern cold region after Guanyinge Dam. Temperature control and crack-proof is very important in the project construction because of northern severe climate, intermittent construction method and the characteristics of RCD dam itself. This paper introduces thedesign criteria of temperature control and crack-proof measure requirements applied on Baishi Dam, and mainconclusions of emulating calculation and analysis. On the basis of theoretical calculation and practical experience, the paper concludes a series of effective crack-proof measures applied to construction such as loweringtemperatures, heat preservation, structure and raw materials. This paper is useful for reference in the aspect oftemperatrue control and crack-proof measures of RCD dam in northern cold region.
出处 《水利水电技术》 CSCD 北大核心 1998年第9期44-47,共4页 Water Resources and Hydropower Engineering
关键词 碾压混凝土坝 温度控制 防裂措施 白石水库 RCD dam, temperature control, Crack-proof measures
  • 相关文献

同被引文献29

引证文献5

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部