2000~2010年龙青段水电开发研究

Hydropower Development Study on Longqing Section from 2000 to 2010
在线阅读 下载PDF
导出
摘要 建议在充分挖掘龙青段已建水电厂潜力的同时 ,2 0 0 0年开工修建公伯峡大型水电厂 ,尽快修建黑山峡水电厂。其它中型水电厂 ,可由黄河上游水电开发有限责任公司在修建上述骨干水电厂的同时 ,连续。 At the time of tapping the potentiality of established hydropower plant, it is suggested to build the large-scale Gongbo Gorge Hydropower Station, and construct the Kangyang Hydropower Station in passing during the construction. Cascaded hydropower plants on Heishan Gorge section shall be built as soon as possible, and Heishan Hydropower Station shall be built at first. Other mid-scale hydropower stations on Longqing section can be built continuously when the above-mentioned large-scale hydropower stations are constructed by Yellow River's Upper Reach Hydropower Development Co. Ltd.
出处 《西北电力技术》 2000年第3期15-17,共3页 Northwest China Electric Power
关键词 龙青段 黑山峡 龙羊峡 水电厂 发电效益 开发 Longqing Section Heishan Gorge Longyang Gorge cascade