摘要
针对新庄孜选煤厂能力提升工程后煤泥水系统的实际,探讨煤泥水处理系统的几个主要影响因素,分析该系统稳定生产、实现一级洗水闭路循环的原因。
Take the coal slurry system of Xinzhuangzi coal preparation plant after update the capacity as example,analysis the main factors which effect the system,and point the reason that the system of Xinzhuangzi plant can run steadily and receive first-degree closed-circuit water cycle across the actual production process.
出处
《煤炭技术》
CAS
北大核心
2013年第2期129-130,共2页
Coal Technology
关键词
煤泥水
改造
实践
coal slurry
transformation
practice