介绍了王英水库的工程概况及汛限水位调整的必要性和可行性,汛限水位调整后的效益及需解决的问题,并结合水库的实际,论述了调整汛限水位的方案,包括汛期的划分、分期洪水设计、汛限水位确定的方法等。
The engineering situation of Wangying Reservoir, the necessity and feasibility of its flood control level adjust- ment are introduced; benefit and problems after adjustment are also presented. Combined with the actual circumstances of the reservoir, the adjustment plan including division of flood season, design of flood stages and determination method of flood control level etc. , is discussed.