摘要
为满足工程建设期间施工生产及生活用水的需要,根据当地特有的自然条件、工程特点,结合多年的工程经验,设计了海勃湾水利枢纽施工供水系统。采用黄河滩地浅层地下水作为主要水源,部分生产用水补充黄河水的方式,供水规模为1 150 m3/h。在工程用水高峰时段或设备检修故障时均能满足工程用水需求。
According to the special nature condition of the area,the project characteristics and long term project experience,the water supply technology for meeting the demand of production and living water-use during Haibowan project construction was designed.The main water source is the low layer ground water of the Yellow River floodplain,partial production water-use will recharge the Yellow River,and the water supply scale is 1,150 m3/h.The design can meet the water demand during the peak of project or examining the equipment.
出处
《人民黄河》
CAS
北大核心
2013年第1期107-108,共2页
Yellow River
关键词
生产用水
生活用水
水源井
用水点
黄河海勃湾水利枢纽工程
production water
living water
water well
water point
elevation
Yellow River Haibowan Water Control Project