某水电站施工供水系统设计 被引量:2

Design of water supply system during construction period of a hydropower station
在线阅读 下载PDF
导出
摘要 针对某水电站工程特点,设计采用左右岸分别设置水厂的独立供水系统,以解决施工前期右岸供水问题,并兼顾后期永久供水需求。综合考虑坝址区高区供水、地形、进场公路、供水安全等因素进行了水厂厂址的合理选择和供水系统设计,采取兼顾总体、局部加压的方式,解决了左岸生产用户分散且高差大的问题,该布置具有灵活、经济、安全等特点。比较了上下游取水口的优劣,推荐的下游取水口方案,通过辅助措施,满足了施工期水质及与永久供水的要求。 Aiming at the characters of a hydropower station,independent waterworks at both side banks were set up respectively to meet the water supply requirement during construction period,and the permanent water supply in later period was considered as well.We comprehensively took into account of the problems of water supply to high elevation,terrain,site road and safety of water supply,then provided a rational waterworks site and water supply system design,which pay attention to total and local pressure;therefore the difficulties of high elevation difference and dispersive water user at left bank side were solved.Through a comparison of upstream and downstream water intake arrangements,the recommended downstream intake scheme can satisfy the requirements of water quality during construction period and the permanent water supply by taking some auxiliary measures.
出处 《人民长江》 北大核心 2011年第16期48-50,共3页 Yangtze River
关键词 供水规模 供水系统布置 厂址选择 系统设计 水处理工艺 water supply scale arrangement of water supply system site selection system design water treatment techniques
  • 相关文献

参考文献4

共引文献3

同被引文献10

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部