期刊文献+

带有工件实际加工时间上界的调度问题研究 被引量:1

Scheduling with Actual Job-Processing-Time Upper Bound
在线阅读 下载PDF
导出
摘要 为了研究更具实际意义位置依赖的单机调度和平行机调度决策问题,建立了带有上界限制的一般性位置依赖工件加工时间模型。在模型中,工件实际加工时间表示为初始加工时间和调度位置的一般函数。此类函数没有特殊函数形式和函数单调性的限制,且其函数值不能超过给定上界。对于单机调度问题和平行机调度问题,研究目标函数分别为最小化总完工时刻和最小化机器总负荷。通过分析证明和把所研究的问题模型转化为经典任务分派问题,进而分析得到求解各个问题的计算复杂度。研究表明,在带有上界限制的一般性位置依赖的工件加工时间模型假设下,所研究调度问题都是多项式时间可解的。 In order to investigate more realistic single-machine and parallel-machine scheduling problems with po- sition-dependent effect, the model of general position-dependent group scheduling is proposed, where the actual job processing times are described by general functions of the normal group setup time and position in the se- quence; these general functions are not assumed to have specific function structure, and are assumed to have up- per bound. By mathematical analysis and transferring the considered problems into the classic assignment prob- lems, the computational-complexity results of solving the considered problems are analyzed. Analysis results show that, even with upper bounded position-dependent job processing times, all the considered problems are still poly- nomially solvable.
出处 《东华理工大学学报(自然科学版)》 CAS 2012年第4期443-448,共6页 Journal of East China University of Technology(Natural Science)
基金 江苏省普通高校研究生科研创新计划项目(CXLX_0162)
关键词 调度 位置依赖 上界约束 总完工时刻 总负荷 scheduling position-dependent upper bound total load
  • 相关文献

参考文献25

  • 1程朋根,熊助国,韩丽华,徐云和.基于GPS技术的大型结构建筑物动态监测[J].华东地质学院学报,2002,25(4):324-328. 被引量:14
  • 2周珏,程朋根,李静.基于MS4W和GPRS/GSM的车辆综合监控系统设计与实现[J].东华理工大学学报(自然科学版),2009,32(2):177-180. 被引量:2
  • 3Agnetis A, Mirchandani P B, Pacciarelli D, Pacifici A. 2004. Schedu- ling problems with two competing agents [ J ]. Operations Research, 52:229-242.
  • 4Bachman A, Janiak A. 2004. Scheduling jobs with position-dependent processing times [ J]. Journal of the Operational Research Society, 55 : 257-264.
  • 5Biskup D. 1999. Single-machine scheduling with learning considerations [J]. European Journal of Operational Research, 115 : 173-178.
  • 6Cheng T C E, Lee W C. 2010. Scheduling problems with deteriorating jobs and learning effects including proportional setup times [J]. Com- puters & Industrial Engineering, 58(2) : 326-331.
  • 7Cheng T C E, Wu C C, Lee W C. 2008. Some scheduling problems with deteriorating jobs and learning effects [ J ]. Computers and In- dustrial Engineering, 54: 972-982.
  • 8Cheng T C E, Wang G. 2000. Single machine scheduling with learning effect considerations [J]. Annals of Operations Research, 98: 273- 290.
  • 9Gawiejnowicz S. 2007. Scheduling deteriorating jobs subject to job or machine availability constraints [ J ]. European Journal of Operational Research, 180( 1 ) : 472-478.
  • 10Graham R L, Lawler E L, Lenstra J K, et al. 1979. Optimization and approximation in deterministic sequencing and scheduling: A survey [J]. Annals of Discrete Mathematics, 5: 287-326.

二级参考文献17

  • 1方志祥,李清泉.基于Mobile Agent技术的空间信息移动服务[J].测绘学报,2004,33(4):328-334. 被引量:11
  • 2张红军.基于3G技术的小型车辆监控系统[J].全球定位系统,2005,30(1):17-21. 被引量:8
  • 3刘大杰 等.全球定位系统(GPS)的原理与数据处理[M].上海:同济大学出版社,1995..
  • 4MapServer.2007.http://mapserver.gis.umn.edu/doc.html.Shashi Shekhar,Sanjay Chawla.2003.Spatial Databases:A Tour.New Jersey:Prentice Hall.
  • 5[5]Ashkenazi V.,and Roberts G.W..[M], Experimental monitoring of the Humber bridge using GPS, Proc., Instn. of Civ. Engrs, 1997, 120:178~182
  • 6[6]Clement Ogaja, etc. Toward the implementation of on-line structural monitoring using RTK-GPS and analysis of results using the wavelet transform, the 10th FIG International Symposium on Deformation Measurement. California, USA,March 2001, 284~293.
  • 7[7]Fujino Y., Murata M., Okano S., Takeguchi M. Monitoring system of the Akashi Kailkyo Bridge and displacement measurement using GPS[J]. Proceedings of SPIE, 2000,3995:229~235.
  • 8[8]Wong K.Y., Lau C.K., Filing A.R. Planning and implementation of the structural health monitoring system for cabe-supported bridges in Hong Kong[J]. Proceeding of SPIE; 2000, 3395:266~276.
  • 9[2]Lovse J.W., Tesky W.F., Lachapelle G., etc. Dynamic deformation monitoring of tall structure using GPS technology[J]. Journal of Surveying Engineering, 1995, 121(1):16~22.
  • 10[3]Simon Chi-wo KWOK. The Hong Kong GPS Network and Reference Stations[J]. Journal of Geospatial Engineering,2000,2(2): 57~66.

共引文献14