加工时间依赖于资源消耗量的平行机调度问题 被引量:6

Parallel machine scheduling problem with resource dependent processing times
原文传递
导出
摘要 研究了一类平行机调度问题,其中假定作业加工时间是资源消耗量的线性减函数,调度的目标是在限定最大完工时间时最小化资源消耗总量.分析了对应单机问题的最优算法和下界构造方法,进而提出了两个优化策略用于构造模拟退火算法和禁忌搜索算法.考虑了多种最大完工时间限制情形,构造了大量随机实验数据,对算法解的精确度及计算效率进行了测试.实验表明所构造的模拟退火算法能够在合理的时间内提供高质量的满意解. We consider the parallel-machine scheduling problem under the consumption that the processing time of each job is a linear decreasing function of the resource consumed. The objective is to minimize the total amount of the consumed resources with the constraint that the makespan does not exceed a given limit. We analyze the optimal algorithm for the corresponding single-machine scheduling problem and the method to construct a lower bound. Two optimization strategies are proposed to design simulated annealing algorithm and tabu search algorithm. A large number of random instances with different characters are generated to examine the accuracy and efficiency of the algorithms. The computational results show that the presented simulated algorithm can yield high-quality solutions for the parallel machine scheduling problems with resource dependent processing times in a reasonable time.
出处 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2012年第7期1485-1493,共9页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(71101040 70971035 90924021) 安徽省自然科学基金(11040606Q27)
关键词 平行机调度 资源分配 模拟退火 禁忌搜索 parallel-machine scheduling resource allocation simulated annealing tabu search
  • 相关文献

参考文献18

  • 1Cheng T C E, Janiak A. Resource optimal control in some single-machine scheduling problems[J]. IEEE Transactions on Automatic Control, 1994, 39(6): 1243-1246.
  • 2谢谢,赵传立,唐立新.一类加工时间依赖资源的单机排序问题[J].数学的实践与认识,2008,38(16):69-75. 被引量:3
  • 3Nowicki E, Zdrzalka S. A bicriterion approach to preemptive scheduling of parallel machines with controllable job processing times[J]. Discrete Applied Mathematics, 1995, 63: 237-256.
  • 4Wan G H, Yen B P C, Li C L. Single machine scheduling to minimize total compression plus weighted flow cost is NP-hard[J]. Information Processing Letters, 2001, 79: 273-280.
  • 5Janiak A, Kovalyov B M Y, Kubiak C W, et al. Positive half-product and scheduling with controllable processing times[J]. European Journal of Operational Research, 2005, 165: 413-422.
  • 6唐恒永,赵琨.带有资源消耗的加权总完工时间单机排序问题[J].系统工程与电子技术,2004,26(11):1601-1603. 被引量:3
  • 7Wang J B, Xia Z Q. Single machine scheduling problems with controllable processing times and total absolute differences penalties[J]. European Journal of Operational Research, 2007, 177: 638-645.
  • 8Danial R L, Sarin R K. Single machine scheduling with controllable processing times and number of jobs tardy[J]. Operations Research, 1989, 37(6): 981-984.
  • 9Cheng T C E, Chen Z L, Li C L. Single-machine scheduling with trade-off between number of tardy jobs and resource allocation[J]. Operations Research Letters, 1996, 19: 237-242. ewpage.
  • 10Janiak A, Kovalyov M Y. Single machine scheduling subject to deadlines and resource dependent processing times[J]. European Journal of Operational Research, 1996, 94: 284-291.

二级参考文献12

  • 1柏盂卓 唐恒永.任务到达时间受资源影响的单机问题[J].辽宁大学学报,2002,(4):313-317.
  • 2Viekson R G. Choosing the job sequence and processing times to minimize total processing plus flow cost on a single machine[J]. OperRes,1980,28:1155-1167.
  • 3Van Wassenhove L N, Baker K R. A bicriterion approach to time cost trade-offs in sequencing[J]..Eur J Oper Res,1982,11(1) :48-54.
  • 4Cheng T C E, Janiak A. Resource optimal control in some single-machine scheduling problem[J]. IEEE Trans Autom Control, 1994,39:1243-1246.
  • 5Janaik A. Time-optimal control in a single machine problem resource constrains[J]. Automatica, 1986,22: 745- 747.
  • 6Janiak A. Single machine sequencing with linear models of jobs subject to precedence constrains[J]. Archiwum Aut, i Telem,1988, (33) :203-210.
  • 7Janiak A. Flow-shop Scheduling with Controllable Operation Processing Times [A], in, Geering H P, Mansour M (eds). Large Scale Systems: Theory and Applications[C], Pergamon Press, 1986. 602-605.
  • 8Vickson R G. Choosing the job sequence and processing times to minimize total processing plus flow cost on a single machine[J]. Oper. Res., 1980(28):1155-1167.
  • 9Nowicki E, Zdrzalka S. A survey of results for sequencing problems with controllable job processing times[J]. Discrete Appl. Math., 1990(26):271-287.
  • 10Wan Guohua, Yen Benjamin P C. Single machine scheduling to minimize total compressing plus weighted flow cost is NP-hard[J]. Information Processing Letters, 2001(79):273-280.

共引文献3

同被引文献106

  • 1唐恒永,赵琨.带有资源消耗的加权总完工时间单机排序问题[J].系统工程与电子技术,2004,26(11):1601-1603. 被引量:3
  • 2丁然,李歧强,孙同景.一种不确定条件下批处理过程的鲁棒调度模型[J].系统工程学报,2006,21(4):387-392. 被引量:4
  • 3Tai Y T, Lai C M. The liquid crystal injection scheduling problem[J]. International Journal of Production Research, 2011,49(2):467-484.
  • 4Shin H J, Kang Y H. A rework-based dispatching algorithm for module process in TFT-LCD manufacture[J]. International Journalof Production Research, 2010,48(3): 915-931 .
  • 5Chuang M C, Liao C J, Chao C W. Parallel machine scheduling with preference of machines [J]. International Journal of ProductionResearch, 2010,48(14): 4139-4152.
  • 6Jia J, Mason S J. Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines[J].International Journal of Production Research, 2009,47(10): 2565-2585.
  • 7Anglani A, Grieco A, Guerriero E,et al. Robust scheduling of parallel machines with sequence-dependent set-up costs [J]. EuropeanJournal of Operational Research, 2005,161(3): 704—720.
  • 8Daniels R L,Kouvelis P. Robust scheduling to hedge against processing time uncertainty in single-stage production[J]. ManagementScience, 1995,41(2): 363-376.
  • 9Kouvelis P, Yu G. Robust Discrete Optimization and Its Applications[M]. Boston: Kluwer Academic Publishers, 1997: 5-11.
  • 10Yang J, Yu G. On the robust single machine scheduling problem[J]. Journal of Combinatorial Optimization, 2002,6(1): 17-33.

引证文献6

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部