期刊文献+

基于Visual Studio的矿井通风井巷网络断面优化研究 被引量:11

On the cross-section optimization of the mine ventilation roadway network based on Visual Studio
原文传递
导出
摘要 根据通风系统优化思想与节能理论,对通风井巷网络断面优化进行研究,选择合理的通风井巷费用拟合方程和摩擦阻力系数拟合方程,并依据分阶段动态优化思想建立完整的通风井巷综合费用模型。在Visual Studio环境下编制模型的解算程序,通过搜索解决复杂的迭代计算过程并得出使总费用最低的通风井巷网络最优断面,用数学方法最大限度地提高通风井巷的利用价值。 The paper is aimed at introducing our research of cross- section optimization of mine ventilation roadway network based on vi- sual studio. As we know, a rational cross-section should be deter- mined to satisfy each intake and return airflow roadway based on the analysis of the relationship between ventilation cross-section and capi- tal construction cost, in addition to the cost of maintenance and rou- tine power ventilation. And, then, it is necessary to work out the ra- tional fitting equation of the ventilation roadway costs and the friction resistance factor. Starting from the point of view, we have established a muhi-stage and dynamic optimization project, a model for the com- prehensive cost of the ventilation roadway planning, which includes the selection of suitable ventilation cross-section, the measures on how to ensure construction safety, technology to be taken and ways to realize utmost economy. In this paper, we have also introduced the solutions to the project realization. Take a Tungsten mine as a case study sample, we have first of all built up the ventilation system frame and then worked out the capital construction cost, maintenance cost and ventilation power cost of the ventilation roadway by using the comprehensive cost model under the constraint condition for the venti- lation resistance, wind speed and roadway cross-section, and last of all the optimal cross-section scheme. The entire work has been done in strict conformity with the needed procedures based on Visual Stu- dio, which include the calculation of ventilation roadway cost and frictional resistance, through all the basic data inputs. In so doing, we have found that there exists a great potentiality to improve the uti- lization features of the ventilation roadway though mathematical calcu- lation and programming procedure, so as to save the high cost of cap- ital construction and maintenance expenditure. And then a theoretical support has been found to select the optimal cross-section of the metal mine ventilation roadway while taking into full account the special geological conditions.
出处 《安全与环境学报》 CAS CSCD 北大核心 2012年第6期208-212,共5页 Journal of Safety and Environment
关键词 矿山安全 矿井通风 井巷断面 优化 模型 解算程序 mine ventilation cross-section optimization model calculating program
  • 相关文献

参考文献10

二级参考文献58

共引文献133

同被引文献91

引证文献11

二级引证文献121

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部