摘要
论述了火力发电机组快速甩负荷的功能和作用,介绍了主机设备的运行方式及工艺系统的配置和设备选型,提出了控制系统的主要设计理念,可供总承包商和有关设计人员在海外项目投标、合同谈判和合同执行阶段参考。
The fast cut back function and effect of the thermal power generator set were expounded.The operation mode of the host device,the configuration of the process system and the equipment type selection were introduced.The main design concept of the control system was proposed,which provides reference for the general contractor and relevant designers in bidding,contract negotiation and contract implementation of the oversea projects.
出处
《华电技术》
CAS
2012年第11期16-17,21,共3页
HUADIAN TECHNOLOGY
关键词
快速甩负荷
高
低压旁路系统
给水泵
回热系统
凝结水
控制系统
fast cut back
high pressure and low pressure bypass systems
feed pump
regeneration system
condensed water
control system