摘要 设备的大修品质和时间会直接影响企业生产的正常运行,结合毛纺企业设备大修的特点将网络计划技术管理方法应用在某企业设备修理的计划与进度控制方面,取得了缩短工期及经济节约的有益效果。 The equipment overhaul quality and time will directly affect the normal operation of production, combined with the characteristics of wool spinning equipment overhaul management method application of network planning technology in a business plan and schedule control of equipment repair, duration has been shortened and the beneficial effects of the economy.
出处 《装备制造技术》 2012年第10期63-64,共2页 Equipment Manufacturing Technology
关键词 大修项目 网络计划技术 应用 overhaul project network plarming technique application
  • 相关文献

参考文献2

二级参考文献16

  • 1Darning L,Ming J. Zuo, Richard C M Yarn. General Sequential Imperfect Preventive Maintenance Models [J]. International Journal of Reliability, Quality and Safety Engineering, 2000, 7 (3) :2536-266.
  • 2Daniel J. A Knowledgebased system for preventive maintenance [J]. Expert Systems,2000,11(17) :59.
  • 3J.莫布雷.以可靠性为中心的维修[M].北京:机械工业出版社,2000.
  • 4MALIK M A K. Reliable preventive maintenance policy [J]. AIIE Transactions. 1979,11 (3) : 221-228.
  • 5Nakagawa T. Sequential imperfect preventive maintenance policies[J]. IEEE Transactions on Reliability, 1988, 37 (3): 295-298.
  • 6易宏.船舶可靠性工程导轮[M].北京:国防工业出版社,1995.
  • 7杰克 吉多.成功的项目管理[M].北京:机械工业出版社,1999..
  • 8AbouRizk S M, Halpin D W. Fitting beta distributions based on sample data[J]. Construction Engineering and Management, 1994, 120(2),288-305.
  • 9Swanson L A, Pazer H L. Implications of the underlying assumptions of PERT[J]. Decision Science, 1971, 2 (10):461-480.
  • 10Littlefield T K, Randolph P H. An answer to Sasieni's question on PERT times[J]. Management Science, 1987, 33(10): 1357-1359.