摘要
介绍了TGP206型隧道地质超前预报仪的基本原理和探测过程,并结合TGP探测技术在隧道岩溶中的超前地质预报的具体应用,通过对比分析验证了预报结果的准确性,展示了TGP预报系统在隧道施工地质超前预报中的广阔前景。
Taking the embankment of the reinforced gabion retaining wail for C5 section in Jishou-Chadong Highway project in Hunan as the background, the construction technology and points with respect to the preparation, gabions processing and assembly, rock-fill in gabions and embankment filling for such retaining wall are described. It is proved by the practice in C5 section that slope treatment with reinforced gabion could not only stabilize the slope but also beautify the environment.
出处
《路基工程》
2012年第5期166-169,173,共5页
Subgrade Engineering
关键词
隧道
地质超前预报仪
应用
highway
subgrade protection
reinforced gabion
construction technology
application