摘要
以兰新铁路第二双线LXTJ9标段乌鲁木齐河特大桥为实例,编制了1-128 m简支系杆拱施工监控方案,对监控方法、步骤、结构仿真分析及各施工阶段监控程序进行了详细介绍,为同类工程提供参考。
Taken Urumqi Large Bridge as an example,which in LXTJ9 section of the second double line of Lanxin Railway,the construction monitoring scheme of 1-128 m simply supported tied arch was made.The method, process,structural simulation and monitoring procedure at each construction stage were introduced in details, which can provide reference to similar projects.
出处
《筑路机械与施工机械化》
2012年第4期72-75,共4页
Road Machinery & Construction Mechanization
关键词
桥梁
系杆拱
测点布置
监控
bridge
tied arch
measuring point arrangement
monitoring