摘要
简要介绍了大冶诺兰达炉炉衬结构与第一次挖修方案形成过程 。
This paper describes the Noranda reactor lining structure and the first mend plan and summaries the technical measures taken in the four mends.
出处
《有色设备》
2000年第3期32-34,共3页
Nonferrous Metallurgical Equipment
关键词
诺兰达炉
炉衬
镁铬砖
残砖
挖修
炼铜
Noranda reactor
Lining
Magnesia-chrome
Resid-ual brick
Mend