摘要 以汉孝城际铁路二标葛洲坝集团黄陂制梁场后张法预应力单箱双室简支箱梁为研究对象,分别对预、初、终张拉三个阶段进行了摩阻参数计算,并结合预应力计算简图提出了预、初、终张拉工艺的要求,结果表明:张拉力满足设计要求,为类似工程预应力张拉计算提供了参考。 Taking the post-tensioning prestressed single-box double-cell simply-supported box girder at the prefabricated beam plant of Huangpo of Gezhouba Group along the second section of Han-Xiao intercity railway as the research object,the paper undertakes the friction parameter calculation at the preparation stage,the initial stage and the final tensioning stage,points out the requirements for the craft of the three stages by combining with the prestressed calculation graphs,and proves by the result that the tension meets the design needs,so as to provide the reference for the similar engineering prestressed tensioning calculation.
作者 潘传喜
出处 《山西建筑》 2012年第25期198-200,共3页 Shanxi Architecture
关键词 预应力 预、初、终张拉 简支箱梁 prestress pre-tensioning and primary tensioning and final tensioning simple-supported box girder
  • 相关文献

参考文献4

  • 1JTGTFS0-2011,公路桥涵施工技术规范[S].
  • 2《建筑施工手册》编写组.建筑施工手册[M].第4版.北京:中国建筑工业出版社,2003.
  • 3铁科技[2004]120号,客运专线预应力混凝土预制梁暂行技术条件[S].
  • 4TB100023-2005,铁路桥涵钢筋混凝土和预应力混凝土结构设计规范[S].

共引文献93

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部