摘要
通过总结水文孔不溢水的原因,结合淮南矿区部分冻结井水文孔报道实例,得出淮南矿区冻结井不溢水或推迟溢水问题的主要原因,并提出了在该矿区进行水文孔设计与冻结施工的一些建议。
According to the summer of the reasons for the hydrology drill without spilled water,the paper concludes the main reasons for the hydrology drill without spilled water or the delayed spilled water by combining with the reports for the hydrology drill at the freezing well in the mine areas of south of Anhui,and points out some suggestions for the design of the hydrology well and the freezing construction in the mining area.
出处
《山西建筑》
2012年第25期82-83,共2页
Shanxi Architecture
关键词
矿区
水文孔
溢水
冻结壁交圈
含水层
mining area
hydrology drill
spilled water
intersection of freezing wall
aquifer