摘要
介绍了铁古坑露天矿开采多层薄矿体的矿石贫化预测、地质管理、定期的统计分析 ,通过对采场矿石贫化的动态管理 。
The ore dilution prediction,geology management and regular statistical analysis for mining multi layer thin orebody in Tiegukeng open pit mine were introduced,through dynamic management of stope ore dilution,the ore dilution and the production costs of mining and benefication were effectively reduced.
出处
《冶金矿山设计与建设》
2000年第3期23-25,共3页
Metal Mine Design & Construction