期刊文献+

基于重要度的通用备件采购数量分配决策研究 被引量:4

Decisions Research on Purchase Quantity Allocation for General Spare Parts Based on Importance Degree
在线阅读 下载PDF
导出
摘要 设备维修备件的采购管理中需要解决的一个问题是:与专用备件相比,通用备件的采购规模往往较多地受采购经费的限制,无法达到其年度的平均需求量。通过引入备件的重要度系数,建立了含重要度系数的设备维修通用备件采购数量分配决策模型,根据备件的重要度进行维修通用备件的采购。通过实证分析说明了该模型可以用来进行定量分析,这种决策方法对采购作业可以起到一定的指导作用。 One of the problems to be solved in the management of equipment maintain spare parts is the purchase, for general spare parts have their peculiarities, compared with the specified spare parts, as a result of procurement funding, it weakens the procurement scale, the general spare parts are unable to meet the average equipment maintenance spare parts demand for the year. The paper establishes a purchase quantity allocation decisions model for general spare parts by introducing the importance degree coefficient. Finally the paper shows a case of this theory to explain its function. It is thought to be of some guidance for purchasing.
作者 毛世红
出处 《科技管理研究》 CSSCI 北大核心 2012年第13期242-244,共3页 Science and Technology Management Research
基金 重庆市自然科学基金项目"基于多阶段博弈的采购机制设计研究"(CSTC 2010BB0041)
关键词 通用备件 重要度系数 采购数量决策模型 general spare parts importance degree coefficient purchase quantity decisions model
  • 相关文献

参考文献14

  • 1赵敏,崔南方.备件库存模式与控制策略研究[J].科技进步与对策,2004,21(4):95-96. 被引量:21
  • 2蒋望东.采购风险管理的一种新方法[J].技术经济与管理研究,2007(2):74-75. 被引量:13
  • 3陈国安.设备备件采购风险及防范措施[J].河南建材,2008(5):80-81. 被引量:3
  • 4彭青洪.项目管理中采购风险的规避与采购成本的控制[J].铁路采购与物流,2009,4(1):54-55. 被引量:8
  • 5潘培道,徐健,李用量.现代企业设备维修备件管理方式的研究[J].轻工机械,2006,24(1):161-163. 被引量:7
  • 6WONG H, HOUTUM V G J, CAI3"RYSSE D, et al. Multiitem spare parts systems with lateral transshipments and waiting time constraints [ J ] . European Journal of Operational Research, 2006 ( 171 ) : 1071 - 1093.
  • 7WONG H, CATYRYSSE D, OUDHEUSDEN D V. Inventory pooling of repairable spare parts with non -zeros lateral transshipment time and delayed lateral transshipments [ J ] . European Journal of Opera- tional Research, 2005 (165) : 207 - 218.
  • 8WONG H, HOUTUM V G J, CATI'RYSSE D, et M. Simple, efficient heurostics for multi - item multi - loaeation spare parts systems with lateral transshipments and waiting time constraints [ J ] . Journal of Operational Research Society, 2005 (56) : 1419 -1430.
  • 9WONG H, CATI'RYSSE D, OUDHEUSDEN D V. Stocking decision for repairable spare parts pooling in a multi -hub system [ J ] . Inter- national Journal of Production Economics, 2005 (93) : 309 - 317.
  • 10COHEN M A, ZHENG Y -S, WANG Y. Identifying opportunities for improving teradyne' s service - parts logistics system [J]. Inter- faces, 1999, 29 (4): 1-18.

二级参考文献26

共引文献58

同被引文献18

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部