期刊文献+

斜拉桥的索力调整 被引量:17

Adjustment of Cable Force for Cable-stayed Bridges
在线阅读 下载PDF
导出
摘要 提出了斜拉桥施工时索力调整的满意满足度法 ,给出了满意度、满足度函数的定义方法 .利用该方法时可根据实际施工情况由工程师给出合适的满意度函数、满足度函数 ,从而能得到更符合工程实际的索力调整成果 .通过计算实例证明了该调整方法的实用性 . The satsfactory content method for the adjustment of cable force in the construction of cable-stayed bridges is proposed in this paper,and how to define the function of satisfactory and content is discussed.The function of satisfactory and content can be defined by engineers on the basis of actual construction condition,therefore the results of the adjustment of cable force that are tallied with reality of engineering are obtained.The practicability of the proposed method has been proved by an example.
出处 《昆明理工大学学报(理工版)》 CAS 2000年第1期125-128,共4页 Journal of Kunming University of Science and Technology(Natural Science Edition)
基金 广东省自然科学基金!(项目编号 :96 0 2 2 3)
关键词 斜拉桥 索力调整 满意度 满足度 cable stayed bridges adjustment of cable force satisfactory content
  • 相关文献

参考文献3

  • 1肖汝诚,项海帆.斜拉桥索力优化的影响矩阵法[J].同济大学学报(自然科学版),1998,26(3):235-240. 被引量:204
  • 2郭文复 林元培 等.斜拉桥最优化调索方法.1994年斜拉桥国际学术讨论会论文集[M].上海:同济大学出版社,1995,9..
  • 3马文田.混凝土斜拉桥的施工控制与索力调整.学位论文[M].广州:华南理工大学出版社,1997,8..

二级参考文献6

共引文献204

同被引文献78

引证文献17

二级引证文献68

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部