期刊文献+

管道设计中的直管段要求 被引量:2

Requirements for Straight Segment in Piping Design
在线阅读 下载PDF
导出
摘要 为保证管道系统设计的性能可靠及安全,通过分析国内外有关标准,综合总结了管道布置设计中三种类别直管段的区别和不同要求:稳流段长度最为复杂,涉及性能和安全,确定可按相应标准或孔板流量计要求;支吊架跨距最好按具体支撑及荷载条件计算;焊缝间距长度尽量满足施工规范,视情况可让步。 In order to ensure piping system reliability and safety, with the analysis of relevant standards at home and abroad, the differences of straight segments in piping layout design and different requirements were summarized. Steady flow segment has the most completed requirements, in which characteristics and safety are involved and which can be determined according to relevant standards and the requirements for orifice plate flow meter. The space between supports should be determined from the calculation based on support and load condition. The straight distance among welds should meet the requirements in construction codes, but which can be compromised.
作者 陈韧
出处 《化工设备与管道》 CAS 2012年第2期59-61,共3页 Process Equipment & Piping
关键词 管道直管段 稳流段 支吊架间距 焊缝间距 piping straight segment steady flow segment space between supports distance among welds
  • 相关文献

参考文献1

共引文献3

同被引文献6

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部