6Murphy S P, Perera T. Successes and Failures in UK/US Development of Simulation [ J]. Simulation Practice and Theory, 2002, (9): 333 -348.
7Saadettin Erhan Kesen, Omer Faruk Baykoc. Simulation of Automated Guided Vehicle (AGV) Systems Based on Just-in-time (JIT) Philosophy in a Job-shop Environment[J], Simulation Modeling Practice and Theory, 2007, 15 : 272 - 284.
8Driscoll J, Thilakawardana D. The Definition of Assembly Line Balancing Difficulty and Evaluation of Balance Solution Quality [ J ]. Robotics and Computer Integrated Manufacturing, 2001, 17:81 - 86.
9陈荣秋,马士华.生产运作与管理[M].北京:高等教育出版社,1999.
10Duclos Leslie K, Spencer Michael S. The Impact of a Constraint Buffer in a Flow Shop [ J]. International Journal of Production Economics, 1995,42: 175 - 185.