期刊文献+

基于eM-Plant的汽车后桥装配线仿真与优化 被引量:3

在线阅读 下载PDF
导出
摘要 借助面向对象的仿真软件eM-Plant,对某汽车后桥装配线进行仿真优化研究,提出改进方案。改进后的生产线,增加一个适当容量的缓冲区和少量工人轮班。仿真结果及工厂实践表明,产量和作业率有大幅提高。
出处 《机械制造》 2008年第10期26-29,共4页 Machinery
关键词 装配线 仿真 优化
  • 相关文献

参考文献8

  • 1Murphy S P, Perera T. Successes and Failures in UK/US Development of Simulation [ J]. Simulation Practice and Theory, 2002, (9): 333 -348.
  • 2熊光楞.离散事件系统仿真及其软件[J].中国计算机用户,1990(6):30-33. 被引量:3
  • 3Saadettin Erhan Kesen, Omer Faruk Baykoc. Simulation of Automated Guided Vehicle (AGV) Systems Based on Just-in-time (JIT) Philosophy in a Job-shop Environment[J], Simulation Modeling Practice and Theory, 2007, 15 : 272 - 284.
  • 4刘光富,彭照.连续流生产单元的运行机理探究[J].工业工程与管理,2007,12(5):11-14. 被引量:3
  • 5郭永辉,钱省三.基于DBR理论的半导体晶圆厂生产作业控制[J].工业工程与管理,2006,11(5):70-75. 被引量:12
  • 6Driscoll J, Thilakawardana D. The Definition of Assembly Line Balancing Difficulty and Evaluation of Balance Solution Quality [ J ]. Robotics and Computer Integrated Manufacturing, 2001, 17:81 - 86.
  • 7陈荣秋,马士华.生产运作与管理[M].北京:高等教育出版社,1999.
  • 8Duclos Leslie K, Spencer Michael S. The Impact of a Constraint Buffer in a Flow Shop [ J]. International Journal of Production Economics, 1995,42: 175 - 185.

二级参考文献12

  • 1魏大鹏.丰田生产方式研究[M].天津:天津科技出版社,1996.
  • 2Spencer M S, Cox J F. Master production schedule development in a theory of constraints environment[J]. Production and inventory management journal, 1995, first quarter: 8-14.
  • 3Odrey N G,Green J D. Adrienne Appello. A generalized Petri net modeling approach for the control of re-entrant flow semiconductor wafer fabrication[J]. Robotics and computer integrated manufacturing, 2001, 17:5-11.
  • 4Schrageheim E, Ronen B. Drum-Buffer-Rope shop floor control[J]. Production and Inventory Management Journal, 1990,thirdquarter: 18-22.
  • 5Ronen B. Starr M K. Synchronized manufacturing as in OPT:from practice to theory[J]. Computers industrial engineering ,1990,18(4):585-600.
  • 6Schragenheim E, Ronen B. Buffer management: a diagnostic tool for production control[J]. Production and inventory management journal, 1991, second quarter: 74-79.
  • 7Wu S Y, John S M, Thomas M G. A simulation analysis of the effectiveness of Drum-Buffer-Rope scheduling in furniture manufacturing[J]. Computers industrial engineering , 1994,26 (4):757-764.
  • 8Leaehman R C, Kang J, Lin V. SLIM.- short cycle time and low inventory in manufacturing at Samsung electronics [J]. Interfaees,2002:32(1), 61-77.
  • 9Lawrence S R, Buss A H. Shifting production bottlenecks: causes,cures conundrums[J]. Production and operations management, 1994, 13(1):21-37.
  • 10Rother M,Harris R.Creating Continuous Flow[M].Lean Enterprise Institute,USA,2001.

共引文献16

同被引文献17

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部