期刊文献+

政府投资项目代建人前期代理管理成果评价及案例研究 被引量:3

Performance Evaluation and Case Study on Prophase Agency Management of Government Investment Project
在线阅读 下载PDF
导出
摘要 文章基于代建制前期代理和中期代建的两阶段划分理念,分析了代建人管理成果指标体系的特征、原则和操作方法。以前期代理为切入点,定义了前期代理管理的范畴,分析了项目前期工作内容,重点研究了代建人前期代理管理成果评价模型。模型以定性指标与定量指标相结合的原则,以便于动态反映管理过程和结果。将专家调查法分别与熵理论和层次分析法结合,对初拟的指标进行筛选、确定权重,建立模糊综合评价模型,构建了前期代理评价体系。最后选取了二个有代表性的案例进行实证研究,说明本评价体系如何在动态评价和静态评价中的应用,验证了所建指标和评价体系的实用性。 Based on the concept of two stages of the agent construction management process which are prophase agency and implementation agent construction, the article analyzes the characteristics of the index system, principle and operational approach of the agent management performance. Focusing on prophase agency, the article defines the prophase agent category, analyzes the project preliminary work content, and concentrates on the management performance evaluation model of prophase agent. Based on the principle of association of qualitative and quantitative, the paper reflects the management level dynamically, makes expert investigation method combination with entropy and analytical hierarchy process respectively, in order to select indicators which have been determined and work out relative weight of each indictor, then builds a fuzzy comprehensive evaluation model and the evaluation systems of prophase agent. Finally, two empirical studies prove that the evaluation system can be used both in dynamic and static evaluation, and verify the validity of the evaluation system.
出处 《华东经济管理》 CSSCI 2012年第5期146-152,共7页 East China Economic Management
基金 国家自然科学基金项目(70871037) 国家发展和改革委员会重大问题软科学项目(50100800030039)
关键词 政府投资项目 代建人 前期代理 管理成果 综合评价 government investment project agent prophase agency management performance comprehensive evaluation
  • 相关文献

参考文献6

二级参考文献10

共引文献21

同被引文献30

  • 1郭彬,张世英,郭焱,冷永刚.企业所有者与经理人委托代理关系中最优激励报酬机制研究——兼论企业产业类型与业绩报酬的关系[J].中国管理科学,2004,12(5):80-84. 被引量:21
  • 2李明,王月波,焦岩.完善政府投资监管体系的思考[J].河北企业,2007(8):10-11. 被引量:1
  • 3Tomomi M. Public investment and business cycles: The case of Japan [J]. Journal of Asian Economics, 2009, 20 (4) : 419-426.
  • 4Williams T, Klakegg O J, Magnussen O M, et al. An in- vestigation of governance frameworks for public projects in Norway and the UK[J]. International Journal of Project Man- agement, 2010,28 ( 1 ) : 40-50.
  • 5Cavallo E, Daude C. Public investment in developing countries:A blessing or a curse [J]. Journal of Comparative Economics, 2011,39 ( 1 ) : 65-81.
  • 6Pannell D J, Roberts A M, Park G, et al. Integrated as- sessment of public investment in land-use change to pro- tect environmental assets in Australia[J]. Land Use Policy, 2012,29(2) : 377-387.
  • 7Wu Y N, Huang Y, Zhang S, et al. Quality self-control and co-supervision mechanism of construction agent in public investment project in China[J]. Habitat Internation- al,2012,36(4) :471-480.
  • 8兰定筠,李世蓉,王德兵.代建合同的成本激励系数[J].重庆大学学报(自然科学版),2007,30(11):135-138. 被引量:6
  • 9Bower D, Ashby G, Gerald K, etal. Incentive mecha- nismsfor project success [J]. Journal of Management in Engineering, 2002, 18(1) : 37-- 43.
  • 10Bryde D J. Modelling project management performance [J]. International Journal o{ Quality ~ Reliability Management, 2003,20(2) :229--254.

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部