摘要
本文结合上海外滩金融中心基坑工程 ,在动态施工反演分析的基础上 ,探讨了支撑拆除对墙体变形、墙体内力及墙后地表沉降的影响 ;并分析了在地下结构未及时施作或因某种原因无法施作时 。
In this paper based on the dynamic back analysis of construction during the foundation work of the fuancial center project in Shanghai,the influence of support removing on the deformation of the wall, internal force of the wall and ground settlement was investigated. Then the influence of support removing on the deformation of the wall and internal force, when the underground stucture wsa not or couldn’t be constructed due to some reasons, was analyzed. [
出处
《地下空间》
CSCD
2000年第1期47-50,共4页
Underground Space
关键词
支撑
地下连续墙
变形
内力
Support, underground continuous wall, deformation, internal force