期刊文献+

基于正交试验设计的多煤层条带开采主控因素分析 被引量:5

Analysis on Main Control Factors of Strip Mining in Multi Seams Based on Normal Test Design
在线阅读 下载PDF
导出
摘要 多煤层条带开采的影响因素众多,为研究各因素对多煤层条带开采的影响,采用FLAC模拟了多煤层条带开采在一定采深时,不同采宽、层间距、层间岩性以及不同的上下留煤柱空间关系时地表的最大下沉值,并应用正交试验设计方法分析了以上4个主控因素对地表最大下沉的敏感程度,其由主到次的顺序为:采宽、上下煤层留煤柱的空间关系、层间岩性、层间距。 There were many influence factors on the strip mining in multi seams. In order to study each factor affected the strip mining in the multi seams, the FLAC software was applied to simulate the maximum value of surface subsidence with strip mining in the multi seams when in a certain mining depth and with different mining width, distance between seams, lithology between seams and the different space relationship between the upward and downward coal pillars. The normal test design method was applied to analyze the four principal factors to the sensitive degree of the maximum surface subsidence. The principal factors in sequence would be the mining width, the space relationship between the coal pillars in the upward and downward seams, the lithology between the seams and the distance between seams.
出处 《煤炭科学技术》 CAS 北大核心 2012年第3期10-12,16,共4页 Coal Science and Technology
基金 国家自然科学基金资助项目(40772191) "十一五"国家科技支撑计划资助项目(2006BAC09B01)
关键词 多煤层条带开采 FLAC 正交试验设计 地表移动 strip mining in multi seams FLAC normal test design surface movement
  • 相关文献

参考文献8

二级参考文献21

共引文献291

同被引文献40

引证文献5

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部