期刊文献+

含周向面型缺陷管道的失效评定曲线 被引量:1

The Failure Assessment Curve of Piping Containing Circumferential Defects
在线阅读 下载PDF
导出
摘要 Two kinds of FACs which contain the crack configuratrion parameter were developed, to reflect the fact that the exact J-integral FACs of the circumferentially cracked pipe for different crack configuration are wide scattering, especially for load with bending moment. One is the FAC described by material stress-strain parameter and crack configuration parameter, which is similar to R6 op.2 FAC. Another is the general FAC containing crack configuration parameter, which is similar to R6 op.1 FAC. The accuracy and the science significance of those FACs were idscussed in detail in this paper. Not only those FACs take on the advantages of R6 FACs, but also the accuracy of them is better than R6 FACs for defect assessment of piping containing circumferential flaws. Two kinds of FACs which contain the crack configuratrion parameter were developed, to reflect the fact that the exact J-integral FACs of the circumferentially cracked pipe for different crack configuration are wide scattering, especially for load with bending moment. One is the FAC described by material stress-strain parameter and crack configuration parameter, which is similar to R6 op.2 FAC. Another is the general FAC containing crack configuration parameter, which is similar to R6 op.1 FAC. The accuracy and the science significance of those FACs were idscussed in detail in this paper. Not only those FACs take on the advantages of R6 FACs, but also the accuracy of them is better than R6 FACs for defect assessment of piping containing circumferential flaws.
机构地区 华东理工大学
出处 《压力容器》 2000年第1期22-33,共12页 Pressure Vessel Technology
基金 国家"九五"科技攻关项目
  • 相关文献

参考文献3

  • 1李琳.压力容器缺陷简化工程评定方法的研究.华东理工大学硕士学位论文[M].,1997..
  • 2雷月葆 李培宁.三段幂次J积分估算方法的验证与改进(一).“八五”国家重点科技攻关课题85-924-02在役锅炉压力容器安全评估与爆炸预防技术研究论文集[M].,..
  • 3雷月葆 李培宁.三段幂次J积分估算方法的验证与改进(二).“八五”国家重点科技攻关课题85-924-02在役锅炉压力容器安全评估与爆炸预防技术研究论文集[M].,..

同被引文献22

  • 1轩福贞,涂善东,王正东.基于TDFAD的高温缺陷"三级"评定方法[J].中国电机工程学报,2004,24(12):222-226. 被引量:8
  • 2American Petroleum Institute.Standard for welding pipelines and related facilities[S].API 1104 Sixteenth Edition,1983.
  • 3Kumar V,German M,Shih C.An engineering approach for elastic-plastic fracture analysis[R].EPRI Report NP-1931,Electric Power Research Institute,Palo Alto,CA,1981.
  • 4Kumar V,German M,Wilkening W,Andrews W.Advance in elastic-plastic fracture analyses[R].EPRI Final Report NP-3067,Electric Power Research Institute,Palo Alto,CA,1984.
  • 5Paris P C Tada H.The application of fracture proof design methods using tearing instability theory to nuclear piping postulating circumferential through-wall cracks[R].NUREG/CR-3464,1983.
  • 6Klecker R,Brust F,Wilkowski G M.NRC leak-before-break(LBB-NRC)analysis method for circumferentially through-wall cracked pipes under axial plusb ending loads[R].NUREG/CR-4572,1986.
  • 7Lejeail Y,Gaillard J P.Feasibility study on the application of a leak before break procedure in metallic vessels of a fast neutron gas cooled reactor[R].CEA Technical note,2002.
  • 8Gilles P,Brust F.Approximate fracture method for pipes-part I theory[J].Nuclear Engineering and Design,1991(127):1~27.
  • 9Gilles P,Chao K S,Brust F.Approximate fracture method for pipes-part II applications[J].Nuclear Engineering and Design,1991(127):13~31.
  • 10Rahman S,Brust F,Nakagaki M,Gilles P.An approximate method for estimating energy release rates of through-wall cracked pipe weldments[R].Fatigue Fracture and Risk,PVP215,San Diego,California,1991.

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部