BIM在工程造价管理中的应用研究 被引量:192

Research of BIM Application in Project Cost Management
原文传递
导出
摘要 我国工程造价模式的计划特色导致造价方式落后,致使造价方法从项目概算开始就已经与实际脱节,"三超"、二次调价索赔等一系列问题均与造价数据的不精确和延后性直接相关。借鉴BIM技术在数据存储、调用上的高效性,分析了其在工程造价及管理上的巨大应用价值,并就实现BIM系统功能面临的问题提出改进建议。 Planning features in our construction valuation model are very notable, which leads to the backward of cost method, in other words, from the beginning of the project, the concerned has been out of touch with reality, causing the"thrce excesses", the second price adjustment claims and other issues, these issues are closely related to the inaccuracy and delay of cost data. Reference the high efficiency of BIM technology in data storage and database, analyzes its huge application value on project valuation and cost management of the project, finally, puts forward some improvement suggestions to solve the facing problems of realizing systemic function of BIM.
作者 张树捷
出处 《建筑经济》 北大核心 2012年第2期20-24,共5页 Construction Economy
关键词 造价模式 BIM模型 数据共享 模拟碰撞 cost model BIM modeling data sharing simulated collision
  • 相关文献

参考文献3

  • 1Ernstrom B, Hanson D. The constructors guide to BIM [M].New York, AGC of America,2005.
  • 2翟超.BIM技术在建造阶段的关键作用.新鲁班,2007,7(1):15-21.
  • 3杨宝明.工程造价管理新思维[N].建筑时报,2010-12-20.

共引文献7

同被引文献562

引证文献192

二级引证文献1529

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部