榕江特大桥悬拼架设临时加强措施设计 被引量:5

Design of Temporary Stiffening Measures for Cantilever Assembling and Erection of Rongjiang Rivre Bridge
在线阅读 下载PDF
导出
摘要 为解决厦门至深圳客运专线榕江特大桥主跨高空悬臂拼装架设过程中局部杆件承载力不足且需要加强杆件较分散地分布于全桥的问题,根据钢桁梁桥的连接特点,采用一种新型的临时加强措施。通过建立全桥各施工阶段有限元模型,计算各杆件受力情况及结构整体稳定性,根据杆件受力情况决定对受力不利杆件采用以下加强措施:对薄弱斜腹杆附加一T形截面杆件,对较薄弱的下弦杆附加一H形截面杆件,加强杆件和被加强杆件共用螺栓连接副。该加强措施具有可由工厂统一加工、易安装且方便拆除,加强杆件与主桁结构协同工作性能较好等优点。 To cope with the problem that the bearing capacity of local members of the main span of Rongjiang River Bridge on Xiamen-Shenzhen Passenger Dedicated Railway was not sufficient in the process of the cantilever assembling and erection high above ground and the members that needed to be stiffened were widely scattered on the whole bridge,a new type of temporary stiffening measures was put forward and employed in the light of the connection characteristics of steel truss girder bridge.By establishing the finite element models for various construction stages of the whole bridge,the force conditions of all members and the global structural stability were calculated and according to the calculation,it was determined that the members that would sustain the unfavorable forces should be stiffened by the following measures: for a weak inclined web member,the T-section member was added and for a weak lower chord,the H-section member was added.The members to be stiffened and the stiffening members were connected by bolt sets.The stiffening members can be fabricated is shop,are easy to be installed and removed and have good joint action with the main truss structure.
出处 《桥梁建设》 EI CSCD 北大核心 2012年第1期90-95,共6页 Bridge Construction
基金 国家自然科学基金资助项目(50978105) 广东省交通厅科技项目(2007-15)~~
关键词 桁梁 拱桥 悬臂拼装架桥 临时 措施 设计 truss girder arch bridge cantilever assembling and erection of bridge temporary measure design
  • 相关文献

参考文献8

二级参考文献33

  • 1易伦雄.大胜关长江大桥工程特点与关键技术[J].钢结构,2007,22(4):78-80. 被引量:17
  • 2潘东发,李军堂.南京大胜关长江大桥钢梁安装方案研究[J].桥梁建设,2007,37(3):5-8. 被引量:23
  • 3李日豪.中国桥梁工程[C]//宋健.中国科学技术前沿.北京:高等教育出版社,1998:99-105.
  • 4刘曾达.长江上的铁路桥梁[C]//联合国亚太开发署.联合国亚太开发署铁路新线建设讨论会论文.北京:中国铁道出版社,1981:25-38.
  • 5朱志虎,高宗余,易伦雄,等.南京大胜关长江大桥关键技术专题研究——新型主桁结构施工控制及钢梁制造技术研究报告[R].武汉:中铁大桥勘测设计院有限公司,2007.
  • 6[1]Kim S. E. and Chen W. F. Practical advanced analysis for braced steel frame design. J. Struct. Engrg. , ASCE, 122(11),1996,1266-1274
  • 7[2]Kim S. E. and Chen W. F. Practical advanced analysis for unbraced steel frame design. J. Struct. Engrg. , ASCE, 122(11) ,1996,1259-1265
  • 8[3]Landesmann A. and Batista E. Advanced analysis of frame steel structures: towards application as a current design tool.Proceedings, 2002 Annual Stability Conference SSRC, 551-570
  • 9[4]Buonopane S. G. , et al. Reliability considerations for steel frames designed with advanced analysis: Proceedings, 2003Annual Technical Session. SSRC, 299-318
  • 10[5]Deierlein G. G. ,et al. Proposed new provisions for frame stability using second-order analysis. Proceedings,2002 Annual Stability Conference SSRC, 1-20

共引文献76

同被引文献28

引证文献5

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部