江苏电网消纳大规模风电的电源规划设计 被引量:21

Generation Expansion Planning with Large-scale Wind Power Integration into Jiangsu Power Grid
在线阅读 下载PDF
导出
摘要 风电出力的间歇性向传统的以确定性为主线的电源规划问题提出了挑战。文中应用概率方法和工具研究了江苏省应对千万千瓦级风电基地消纳的电源规划问题,分析了合理电力备用率和最优电源结构,讨论了电源结构优化中风电调峰容量需求的合理参数设定。针对江苏电网的调峰容量供需矛盾,通过多方案对比得到风电、核电和抽水蓄能容量配比灵敏度。最后,根据过江断面容量规划分析了江苏省电源的合理布局。 The intermittent nature of wind power challenges the generation expansion planning based on deterministic methodology.By utilizing probabilistic methodology and software,this paper discusses the issue of generation expansion planning with large-scale wind power integration into Jiangsu power grid.System adequacy analysis and optimal generation mix are studied together with the discussion of proper parameters of peak-valley regulation capacity demand for wind power in the optimization.Considering the intense constrains between the source and demand of peak-valley regulation capacity,sensitivity analysis of the capacity between wind power,unclear and pumped storage are carried out.The statistics of power flows across Yangtze River are also calculated to analyze the proper generation location in Jiangsu.
出处 《电力系统自动化》 EI CSCD 北大核心 2011年第22期60-65,共6页 Automation of Electric Power Systems
基金 国家高技术研究发展计划(863计划)资助项目(2011AA05A105)~~
关键词 风力发电 电源规划 时序生产模拟 电源结构 电源布局 wind power generation expansion planning chronological production simulation generation mix generation location
  • 相关文献

参考文献17

二级参考文献87

共引文献668

同被引文献428

引证文献21

二级引证文献417

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部