摘要
采用Girimaji非线性紊流模型和Willam-Warnke五参数破坏模型分别模拟弯肘形尾水管水流状态和混凝土材料,并使用APDL语言编制了尾水管隔墩的结构和水力联合优化程序。使用该程序对一河床式水电站尾水管技术改造进行分析,得到了隔墩下移的较优值,为工程设计提供了可靠的数值依据。
Based on Girimaji non-linear turbulence model and William-Wamke 5-parameter failure model, both the flow regime and concrete material of the elbow draft tube are simulated, and then a combined structural and hydraulic optimization program for the dividing pier of elbow draft tube is compiled with ANSYS Parametric Design Language(APDL). When the program is applied to the calculation for the technical improvement on the draft tube of a hydropower station in river channel, not only a better value for the move-down of the pier is obtained, but also a reliable data basis is made for the engineering design of the project.
出处
《水利水电技术》
CSCD
北大核心
2011年第10期97-100,共4页
Water Resources and Hydropower Engineering
基金
国家自然科学基金青年科学基金(50909072)
教育部博士点新教师基金(20090032120082)
教育部"长江学者和创新团队发展计划"创新团队(IRT0851)
关键词
水电站
尾水管
隔墩
联合优化
紊流模型
hydropower station
draft tube
dividing pier
combined optimization
turbulence model