隧道下穿采空区的监测及结果分析 被引量:21

Monitoring on Tunnel through the Goaf and Analysis of Its Results
原文传递
导出
摘要 以山西灵石隧道下穿采空区段为研究对象,通过有限元数值模拟分析得出隧道洞室的拱顶下沉和周边收敛值,并对隧道穿越采空区段部分采空区的应力,隧道洞室的拱顶沉降和周边收敛等进行监测。将实测结果和模拟值进行对比分析,结果表明,本文采用的最小安全厚度为7m的安全厚度计算模型是安全可靠且可行的,提出的浆砌片石墩柱、钢拱架支撑、超前小导管注浆、超前锚杆等措施相结合的采空区治理方案是可靠有效的,可为以后类似工程提供借鉴。 This study,based on Shanxi Lingshi tunnel through the goaf,applied the finite element numerical modeling technology to get the value of arch settlement and convergence around the tunnel cavern.In this part of the goaf,the stress,tunnel vault settlement and peripheral convergence were monitored and the measured results and simulated values were compared.The results show that in this paper the minimum safety thickness 7m for security thickness model is safe and feasible,proposed measures such as column from flake stone with mortar,steel arch skid support and advanced small catheter grouting,advanced anchor and so on are reliable and effective,which can serve as reference for similar projects.
出处 《地下空间与工程学报》 CSCD 北大核心 2011年第4期753-758,共6页 Chinese Journal of Underground Space and Engineering
关键词 采空区 隧道 数值模拟 应力 拱顶沉降 周边收敛 监测 goaf tunnel numerical modeling stress vault settlement surrounding convergence monitoring
  • 相关文献

参考文献9

二级参考文献11

共引文献105

同被引文献138

引证文献21

二级引证文献120

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部