摘要
文中对隧道穿越既有公路交通涵施工技术进行分析,就下一步施工中洞内、洞外施工工艺及施工关键控制技术进行了分析,确定了隧道穿越既有高速公路交通涵段的施工控制技术,并提出了有效的施工方案。
This paper analyzes the construction technology of tunnel passing through existing of highway culvert of traffic,such as the next step in the construction of the cave, inside the cave, construction technology and key control techniques, the author identify the construction control technology of culvert section of freeway traffic through the tunnel, and proposes effective construction scheme.
出处
《科技创新与生产力》
2015年第3期105-108,共4页
Sci-tech Innovation and Productivity
关键词
隧道工程
下穿施工
施工技术
双侧壁法
tunnel engineering
wear under construction
construction technology
double wall method