公伯峡水电站接入系统与西北电网高一级电压等级选择 被引量:1

The Connection of Gongbo Gorge Hydropower Station to Northwest Power System & Higher Voltage Level Selection of this System
在线阅读 下载PDF
导出
摘要 展望黄河上游公伯峡水电站建成后接入系统与西北电网高一级电压等级选择的关系。按电网建设应远近结合和比较经济合理的基本原则,提出公伯峡水电站接入系统方案,是西北电网出现高一级电压等级线路的切入点。 The paper forecasts the relation between the connection of Gongbo Gorge Hydropower Station which will be built at upper reaches of yellow river to Northwest power system,and the selection of higher voltage level of the system.The scheme of connecting of Gongbo Hydropower Station to the power system is put forward according to basic principle of power grid construcion relied on far-near combination,as well as the comparable economical & reasonable considerations.Gongbo Gorge Hydropwer Station will be the connection point to transmission line of higher voltage level at Northwest Power System.
作者 黄明良
机构地区 西北电力设计院
出处 《西北电力技术》 1999年第4期6-12,20,共8页 Northwest China Electric Power
关键词 电网 电压等级 接入系统 水电站 Northwest power system 750kV voltage level 350kV voltge level Gongbo Gorge hydropower station operation on network scheme demonstration
  • 相关文献

同被引文献3

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部