摘要 对500 kV岩平线加装高抗后出现的非全相运行时的工频谐振过电压问题进行了仿真和分析,认为造成岩平线出现过电压的原因主要是高抗补偿度较高、线路未换位造成三相参数不平衡以及高抗中性点电抗取值不合适。提出了解决岩平线过电压问题的技术措施。岩平线按照提出的技术措施进行了改造,改造后的试验结果表明提出的技术措施是有效的。 The power frequency resonance overvohage problem of 500 kV Yan-ping transmission line under non-full phase operation after installation of high voltage shunt reactor is analyzed. Reasons of the overvoltage problem are found which are higher compensation degree of high voltage shunt reactor, untransposition of the transmission line and improper neutral reactor value of high voltage shunt reactor. Technical measures that the transmission line is transposed and the neutral reactor value is rechosen are proposed. Yan-ping trasnmission line is modified based on the proposed measures, and test results after the accomplishment of the modification project show that the proposed technology measure is effective.
出处 《广西电力》 2010年第4期1-4,共4页 Guangxi Electric Power
关键词 非全相运行 工频谐振 过电压 高抗 non-full phase operation power frequency resonance overvohage high vohage shunt reactor
  • 相关文献

参考文献6

二级参考文献8

共引文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部