摘要
分析了三峡电站的季节性发电特点和三峡电力系统各网间电源结构的差异。指出三峡电力系统的规划设计方案未考虑各网间相互调剂,将会增加建设投资和运行困难。建议组织研究各电网间相互调剂的技术和经济方案,这样就能使各网都获得很大的技术和经济效益。
篈nalyze the seasonal generating character of Three Gorges Power Station,and different character of the power source structure among the grids of Three Gorges Power System.Point out that the planning program of Three Gorges Power System, which has not considered the regulation among the grids, would increase more capital investment and would cause diffcult operation of the grids.Propose to organize of studying on technical and economic programs of the regulation among the grids,this would make the grids to achieve more technical and economic benifits.
出处
《华中电力》
1999年第2期1-2,14,共3页
Central China Electric Power
关键词
三峡水电站
输变电工程
电力系统
Three Gorges Power System, Run flow Generation, Planning design, Smooth adiusting controllable reactor