摘要
大功率采煤机截割部,结构复杂、承载能力突出、控制运转要求严格。应用调节技术设计采煤机的模拟试验台,结合采煤机负载图谱对系统进行多参数多输入控制,使之有效、可控、易于实现,达到良好的经济效果。
Cutting part of high-power coal mining machine with complicated structure,prominent bearing capacity and strict control of works.Using regulating technology to design simulator test rig for coal mining machine,combining with the coal mining machine load map to control the system in multi-parameter and multi-input to make it efficient,controllable,easy to be realized and to achieve good economic effect.
出处
《煤矿机械》
北大核心
2011年第5期71-73,共3页
Coal Mine Machinery
关键词
采煤机截割部
试验台
二次调节
仿真
coal mining machine cutting department
test rig
secondary adjusting
simulation.