摘要
提出了将计算机模拟技术用于生产作业计划与控制所遇到的问题和解决问题的三种模拟计算方式,包括分布式方式、基于C/S的网络方式和基于Web 的交互式方式.设计了三种计算方式的网络结构.
The problems faced in applying computer simulation technology to the scheduling and rescheduling are discussed. Three simulation modes including the distributed mode, C/S based computer nets mode and Web based interactive mode are proposed. The network structures of three simulation modes are designed with the principles given.
出处
《华中理工大学学报》
CSCD
北大核心
1999年第10期83-84,89,共3页
Journal of Huazhong University of Science and Technology
基金
教育部博士点专项基金
关键词
计算机模拟
生产作业计划
分布式
交互式
computer simulation technology
scheduling and rescheduling
distribution mode
interactive mode